Because I am swamped with paying work, Ive taken a few days off of the build. Hurricane Sandy has changed that, and caused major slow down in my work, so Im back to the important things in life... the boat build. I have to say that while we are four or five hundred miles from Sandy, we had 25 mile per hour winds sustained last night while she came ashore. To begin the interior, bolting lumber to the metal frames is the first order of work. To make it seem like I was getting something done, the first attachment I made was to bolt lumber to the ceiling frames. Because of the camber of the ceiling frames and not wanting to piece things together, I had to use a 2x6 for the ceilings. It seems like a lot of waste, but all the off fall was ripped again for the side wall frames.
The barn is about as full as it can get and the only place to set up my table saw is under the roof of the aft deck. I had to position the saw so I can make long rips through the door of the salon. The basic method of getting the ceiling beams done was to clamp the 2x6 to each end of the frame. I then used a scribe set for the gap between the 2x6 and the frame at the center of the frame and scribed the top ( roof ) side of the cut. Because the frames are so long, and the curve not that radical, I was able to use a circular saw to cut shy of the line
. The cut put the saw in a bit of a bind, but it was not too hatefull, and thats what tools are for. Once the roof side was cut to shape, I re clamped the board to the frame, set the scribe for 5/16", and scribed the interior side of the cut. Once again, I used the circular saw ( vs the band saw ) and made the cut. All the boards are being held proud of the steel frame about 5/16" so foam remains on the frame flange after the foam is trimmed. With the board now cut to fit, I applied a bead of polyurethane adhesive and re clamped the board. I then use my right angle air drill, and drill through the existing holes in the steel frames. Next I use a hammer to drive the 1/4"x2" carriage bolts home, followed by a flat washer and a nylock nut, then tighten all the bolts using a 3/8" air ratchetGluing the lumber to the frames in addition to bolting might seem like over kill, but bolts have a funny way of working loose in lumber, and since the adhesive is not that expensive, I think it to be good insurance to prevent a squeak.

As I type this post on this rainy Tuesday, I have all the ceiling beams finished in the wheel house, salon, and aft deck. I also have the wheel house walls and windows complete, and am getting ready to start on the salon. Another full day, and I should be finished bolting all the lumber in place.
I have an insulator showing up in the morning to give me a price on foaming the interior. Im going to foam the interior down to within a couple of inches of the weld zones.
While I still have the boat in the shop, Im going to also install the Cherry plywood at the window opening so I dont have to deal with that at the cold boat yard. Im using a clamp ring for the window installation, so I have to have the finished wood in place in order to install the windows. The window installation is also complicated by the fact that the maximum wall thickness at the window is 2 1/4", while the frame thickness of the boat is 3 7/8". Its kind of a strange deal to describe, but on the salon windows and the side windows of the wheel house, the windows will be set in by the difference. The front wheel house windows will be flush with the interior as I was able to make the tabs work out to 2 1/4" wall thickness. It will look OK as Im going to spend a righteous amount of time getting the trim right, but it does add a whole bunch of work to the window trim job. Im not quite sure how the finish window trim will look, but Im going to use each clamp ring as a template before I install and make a pattern out of paper board for future fabrication of wooden trims for the windows.

The weather had for sure turned here, but I have plenty to keep me busy getting the super structure in a more finished state. Taking the super structure as far as installing the windows before shes landed and welded in place has entered my mind, but I think it too risky. I can install lots of the trim, some of the ceilings along with some wiring and a host of other items before I have to commit to taking her out of the barn. While Im aching to have her assembled at the boat yard, all of this work goes much faster while shes in the barn.
Cheers
I like the way the exhaust funnel looks and in order to keep things looking good I had the metal formed on a press brake. The fab shop owners is one of my neighbors and it was fun helping him do this small job for me. The exhaust funnel is tapered so there are two different radiuss on the piece. In order to get the different radiuss Mark set the machine to hit harder on one side than it did on the other. His machine is a Cincinnati 300 ton press brake, and was built in 1942. Cincinnati is a good brand, and this machine was built in a era in this country that has faded fast. We need our manufacturing jobs. Mark laid the pieces out for 20 hits per piece, and in this picture, you can see him lining the die up to hit on his punch marks. .jpg)
.jpg)
Im a little blown away with how long it took to get the metal work completed. I did have a major set back in that the rough openings for the windows were cut for a four inch radius, and the windows are built using a six inch radius. There are 17 windows in the super structure and the repair consisted of me using my plasma cutter to cut out the 68 corners out of the existing rough openings. I then cut 68 new radius corners and welded them back in to the openings. The windows in the salon were easy as they were all square. The windows in the pilot house were a bit more of a challenges as they are all parallelograms, and required a little bit of noggin work to get the angles along with the radiuss correct. But, the window openings are now correct and all the widows fit the way theyre supposed to. Along with repairing the window openings, I added 60 or 70 more tabs to the window openings to bolt framing lumber to.
We have a shower for the cabins below deck, but due to the size of my posse, I felt it best if we had another shower on board. The easiest place to do this was on the aft deck in the port side corner of deck on the salon bulkhead. This will be a hot/cold shower. I fabricated a stainless shelf with a lip on it to retain soap, and a bar for wash rags and to hold back shampoo bottles.
On the aft salon bulkhead on the aft deck the fuel fills and vents reside. There is a two inch fill on both the port and starboard side. Next to each fill are the vents for the two port side tanks and two starboard tanks. The fill and vent pipes are welded in place. I really need a box around each set of pipes, similar to what Peter did on Koala ( now Kame Hele... not sure of the spelling). I have a little bit of time left where I can fabricated these boxs, and I might try braking them over the work bench. If not, my neighbor will do it on his press brake.
I welded the six inch vent intakes for the master cabin. These vents are in the foreword wall of the wheel house.
I was going to get fancy and use a torsion spring to have the ladder self stow up on the roof, but my short time frame killed that idea and I decide to stow the ladder on stainless post welded to the front of the wheel house. The forward rake of the wheel house windows along with the almost 5 distance to the Portuguese bridge will allow all to pass by this area without bumping the ladder. It will make more sense once the super structure is welded to the hull. 