The next job at hand on Conalls big boat build is to finish getting ready for the insulator to do his thing. I need to finish painting the engine room witch is turning into quite a bit of unfinished business. My list of what needs to be done in the engine room is as follows:
- Install the generator and weld in all the fittings for the water lift exhaust system.
- Weld close the generator access hole.
- Install ac and dc electric conduits and various junction boxes and fixture boxes.
- Install the center baffle on the exhaust/intake trunk
- Re-prime the engine room with etching primer, then top coat with Alkyd Enamel
- Install all the wood firing.
This is the abbreviated version of my list as I still have ac and dc conduit work to do in the master stateroom, forward cabin, and head. All in all I would have to guess that Ill have a solid month worth of work to get her to the point of being ready to insulate.
I"ll start to post some pictures as I move forward. Ive found that this boat building thing seems to go a little easier if I break the "big boat build" down into about 80,000 smaller jobs that make up the "big boat build". I might continue this post and add to it as I mover forward, or Ill post a separate entry for each of the micro jobs I get finished.