This is going to be the first of a few posts relating to my fuel system. Im glad I did not bid building this system for someone as Im finding this job burning up a lot more time and material than I would have guessed.
The first order of business for building the fuel system were installing the fill pipes. I have four integral tanks in the engine room with a capacity between 1200 - 1300 gallons. I have o
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEjax1m2DLB0ENipVip_3gMkNq0KI71wJCSVdFG43jnDb3pDPCrrC3smvnyAWLeR1Qwugoh9T77KB5lNCicsOES01avKce1BqrjGo59kFSLJfl-8ib4ZngsfGhszbNR2fgvrVect7oh3cQI/s320/Fuel+system+024.jpg)
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEj5UlB6XhCF_9G3W82PtKIJ1MI5NTQNHP6evs-xFyp5UjyYMXlvaHAbIM_hLpLAmUnfxfb8oj3WNEqFQ9G7C60ieoAZOisJY-UdAn1ZV7kAn-B97AzhkBS3B6dNvmksgxENSS3Al0-2SI8/s320/Fuel+system+012.jpg)
The tank vents are 1" steel pipe sch. 40 and will exit the boat with the fill pipes and terminate at the fill stations.
After the fill pipes were fabricated I turned my attention to the fuel transfer piping. With four tanks on board, and one of those tanks being used as my day tank, I have to be able to transfer fuel from any one tank to any tank I desire. In order to transfer fuel Ill utilize an electric pump with a manual pump as my back up. Each tank has a dedicated pick up tube that extends to about 1" above the tank bottom for the transfer system. I added a second pick up tube to each tank to give me the option on using the second pick up tube for feeding the machinery while still having a stand alone fuel transfer system. The fuel transfer system has a large Racor filter that will clean the fuel and separate any water in the fuel before the fuel goes to the day tank.
![](https://blogger.googleusercontent.com/img/b/R29vZ2xl/AVvXsEgTPNDlnuVUSSti-jmnzt8x_j3RI4h54YwJquC_r1vaRrso6xs19H8hxZzoPEmg9iM7j8602KdWXR0Jc6SYG12gnugeeE_7k7iiNcVXkJr1rqJMA7-byBEMarUkDt8XeB7tA3G0sIma8aE/s320/Fuel+system+025.jpg)
I wanted to get a decent flow rate out of my transfer system, and because I was a little nervous about friction loss in the transfer pipe, I used 3/4" sch. 40 steel pipe for the transfer system.
Im in the excavating business, and Im always calling to have underground utilities marked before I dig on a job site. The marking companies spray paint the location of the various utilities on the ground using the following colors: red for electric, blue for water, yellow for gas, orange for cable and phone, and green for fuel or oil related. Given I have to paint the pipe to protect it, I have chosen to paint all the fuel related parts in the engine room green.
There is a lot to the fuel system, and I feel as if I got a good start on my first week of working on it.