I finished making all the plumbing connections for the cabins.
99% of the connections are under the sole in the bathroom. This space has turned into a busy area as it has passing through it four fill lines for the water tanks, the shower/sink pump sump, the water supply lines for the two sinks, the drain lines for the two sinks, the drain line for the shower, the "Y" valve for directing the sump discharge, the transport lines for the sump discharge, the 1 1/2" transport line for

Im going to build the shower stall out of tile. Since I was working in this area, I decided to install the backer board for the tile, and

After making all the connections, I ran the shower sump to verify the flow rate. The shower sump is not going to have enough ass to move the shower water to my proposed gray water tank area ( the rear of the boat). Im going to have to find another area for my gray water holding tank. The best place for this tank is going to be close to the overboard discharge point in the forward cabins. The tank will probably end up in the "V" up against the crash bulkhead @ station #1. I think Ill be able to fit a 40 gallon tank. My other choice is going to be under one of the kids bunks. The problem with going under the bunk, is that Ill eliminate a much needed storage cabinet.
Im ready to sheath the bathroom, the dressing room/hallway, and part of the kids cabin. Im going to have to hold off on sheathing the rest of the cabin until I get the gray water

Im going to use a composting toilet, but just in cast it does not perform, I installed a transport line for a future macerating style toilet. I